Joseph McLean of Wright-Pierce was contracted to evaluate Taylor Pond to understand why flooding occurs and how to lower the maximum height of such flooding. His full report is available in PDF format.
Category Archives: Engineering Reports
2013 Geomorphology Report by John Field
This letter shall serve as a report on the results of a qualitative geomorphic assessment I conducted for the Taylor Pond Association. The goal of the assessment was to better understand the causes for siltation at the Taylor Pond outlet and to provide management recommendations for controlling flooding and erosion between the outlet and the Hotel Road crossing approximately 950 ft downstream.